The Daily Pulse

Trending

Bridge construction delays cause traffic jams and truck collapse in two areas

Reported by Sneha Patil (Staff Writer) Β· Dinamalar Β·

Verified β€” Confirmed by a second source: Maalai Malar

Confirmed by a second source: Maalai Malar

Important
TrendingBridge construction delays cause traffic jams and truck collapse in two areas
Representative image Β· Pexels

What Happened

In Bhavani along the Salem-Coimbatore national highway near Chithode and Nasiyur, bridge construction work has been going on for six months, causing daily traffic jams during the day and vehicle accidents at night. Meanwhile, in Punjab on the Patiala-Sangrur bypass near Pasiyana village, an iron bridge over the Bhakra canal collapsed early today when two trucks were crossing it, causing both trucks to crash into the rubble and one to catch fire.

Reaction

Fire personnel rushed to the Patiala site and put out the fire after a hard fight, and officials stated that no deaths happened in the bridge collapse. At the same time, motorists in Bhavani have asked authorities to finish the bridge work quickly.

What's Next

Authorities are currently investigating the exact reason why the bridge in Punjab collapsed.

Context

Road and bridge construction projects often face delays that disrupt local traffic and create safety hazards for drivers. Investigators typically examine load limits, vehicle weights, and structural integrity when a bridge fails.

Read more at Dinamalar β†’