Trending
Bridge construction delays cause traffic jams and truck collapse in two areas
Reported by Sneha Patil (Staff Writer) Β· Dinamalar Β·
Confirmed by a second source: Maalai Malar

What Happened
In Bhavani along the Salem-Coimbatore national highway near Chithode and Nasiyur, bridge construction work has been going on for six months, causing daily traffic jams during the day and vehicle accidents at night. Meanwhile, in Punjab on the Patiala-Sangrur bypass near Pasiyana village, an iron bridge over the Bhakra canal collapsed early today when two trucks were crossing it, causing both trucks to crash into the rubble and one to catch fire.
Reaction
Fire personnel rushed to the Patiala site and put out the fire after a hard fight, and officials stated that no deaths happened in the bridge collapse. At the same time, motorists in Bhavani have asked authorities to finish the bridge work quickly.
What's Next
Authorities are currently investigating the exact reason why the bridge in Punjab collapsed.
Context
Road and bridge construction projects often face delays that disrupt local traffic and create safety hazards for drivers. Investigators typically examine load limits, vehicle weights, and structural integrity when a bridge fails.
More in Trending
TrendingVerified β Confirmed by a second source: News On AIRImportant
Bihar Showcases Cultural Heritage at 45th India International Trade Fair in New Delhi
Reported by Kunal Bhatia (Senior Writer) Β· The New Indian Express Β·

TrendingVerified β Confirmed by a second source: Deccan ChronicleImportant
Virudhunagar Prepares for Sunday Polio Drive Targeting 1.3 Lakh Children.
Reported by Ananya Das (Senior Writer) Β· The Hindu Β·
TrendingVerified β Confirmed by a second source: Asianet News MalayalamImportant
India posts record 720 runs against New Zealand in first Test.
Reported by Kunal Bhatia (Senior Writer) Β· Manorama Online Β·
